Construction Cost Estimation

Costs Associated with Constructed Facilities

The costs of a constructed facility to the owner include both the initial capital cost and the subsequent operation and maintenance costs. Each of these major cost categories consists of a number of cost components.

The capital cost for a construction project includes the expenses related to the inital establishment of the facility:

  • Land acquisition, including assembly, holding and improvement
  • Planning and feasibility studies
  • Architectural and engineering design
  • Construction, including materials, equipment and labor
  • Field supervision of construction
  • Construction financing
  • Insurance and taxes during construction
  • Owner's general office overhead
  • Equipment and furnishings not included in construction
  • Inspection and testing
The operation and maintenance cost in subsequent years over the project life cycle includes the following expenses:
  • Land rent, if applicable
  • Operating staff
  • Labor and material for maintenance and repairs
  • Periodic renovations
  • Insurance and taxes
  • Financing costs
  • Utilities
  • Owner's other expenses
  • http://pmbook.ce.cmu.edu/05_Cost_Estimation.html